20 factory English-speaking jobs in Limburg

  • Northvolt Poland
  • Heide
  • December 21
and commissioning of our new battery factory in Heide, Germany. ... We are searching for a highly experienced and motivated Factory Layout Design Manager in Germany to join ... Built in multiple phases over 5+ years the factory represents a multi-billion Euro investment project ... Key responsibilities include but are not limited to: Managing and mentoring the factory layout project ... You will be part of the Factory Program leadership team that will drive the planning, purchasing, construction
  • Northvolt Poland
  • Heide
  • December 21
Northvolt has an exciting job opening for an Engineer with experience in the field of Factory planning ... e.g., Automatic Storage and Retrieval Systems, Production-Buffers, Robots, AGVs, etc.) for the Drei Factory ... Your journey includes strong collaboration with the cross-functional factory design team in Stockholm ... By accepting this mission, you will take a key role in shaping Northvolt’s Giga Factory in Heide to produce
  • Northvolt Poland
  • Heide
  • January 15
The factory will be built in multiple phases over 5+ years and the factory represent a multi-billion ... office is currently located in Hamburg with an outreach to Heide, Schleswig-Holstein where the giga-factory
  • Northvolt Poland
  • Heide
  • January 20
commissioning of our new battery factory in Heide, Germany. ... You will be part of the Factory Program team that will drive the planning, purchasing, construction and ... Built in multiple phases over 5+ years the factory represents a multi-billion Euro investment project
  • Northvolt Poland
  • Heide
  • December 21
Built in multiple phases over 5+ years the factory represents a multi-billion Euro investment project ... play a lead role in the Project Engineering team that will drive the construction of our new battery factory
  • Northvolt Poland
  • Heide
  • December 21
We are looking for a skilled and detail-orientated (Senior) Project Cost Engineer for our Factory Program ... The factory will be built in multiple phases over 5+ years and represents a multi-billion Euro investment
  • Northvolt Poland
  • Heide
  • January 20
By joining us, you will be a key player in establishing a new, scalable factory digitalization function ... We aim to deploy and customize this system for each new factory and manufacturing setup on Northvolt& ... About the Team As Drei is under ramp-up, we are establishing a function to prepare for our factory expansion ... design MES component configuration & deployment Digital commissioning - testing & validation Digital factory
  • Northvolt Poland
  • Heide
  • January 15
with knowledge of robotic automation systems, software, and hardware components, etc.) for the Drei Factory ... Your journey includes strong collaboration with the cross functional factory design team in Stockholm
  • Northvolt Poland
  • Heide
  • December 21
The factory will be built in multiple phases over 5+ years and represents a multi-billion Euro investment ... office is currently located in Hamburg with an outreach to Heide, Schleswig-Holstein where the giga-factory
  • Robertson and Caine International Yachts
  • Eiland
  • January 13
Maintenance as per the Factory Maintenance Plan.
  • Medtronic
  • Heerlen
  • January 13
From the R&D lab, to the factory floor, to the conference room, every one of us experiments, creates,
  • Medtronic
  • Heerlen
  • January 11
From the R&D lab to the factory floor to the conference room, every one of us experiments, creates, builds
  • Northvolt Poland
  • Heide
  • December 21
but are not limited to: Ensure that the design leads to safety on the construction site and a safe factory
  • Medtronic
  • Heerlen
  • January 11
From the R&D lab, to the factory floor, to the conference room, every one of us experiments, creates,
  • Northvolt Poland
  • Heide
  • January 6
office is currently located in Hamburg with an outreach to Heide, Schleswig-Holstein where the giga-factory
  • Northvolt Poland
  • Heide
  • December 21
of integrating a battery electrical energy storage as a peak-shaving and back-up system to optimize factory
  • Samsung Electronics Perú
  • Heerlen
  • January 20
will be part of the Contracts and Innovation team which governs and develops contract strategy and factory
  • TecAlliance
  • Heerlen
  • January 7
As a Technical Requirements Coordinator (m/f/d), you will be an integral part of our dynamic Data Factory
  • Northvolt Poland
  • Heide
  • December 21
Your journey includes strong collaboration with the cross functional factory design team in Stockholm
  • Northvolt Poland
  • Heide
  • December 21
About the work environment The office is located in Heide, Schleswig-Holstein where the giga-factory
Email me future jobs like these:
next page